1 |
Provision Of De-oiling and Intelligent Pigging for SEA
HIBISCUS Pipeline |
Apr 2018 – Jan 2019 |
SEA HIBISCUS Sdn. Bhd. |
Degassing, de-oiling, assist intelligent pigging
inspection, dewatering, nitrogen grying
SILK 255 8” x km gas lift pipeline SJJT-G/ SJP-A
SILK 149 10” x km crude oil pipeline SFJT-B/ SFP-A
|
2 |
Provision Of Pre-Commissioning, De-Commissioning and
Commissioning for PGPP PENGERANG Sg. LAYAU Pipeline
Replacement |
Jul 2018 - Oct 2018 |
PETRONAS Gas Berhad |
Degassing, cleaning, gauging, dewatering, nitrogen
drying & commissioning
36'' x 15km ML502/ ML503
|
3 |
Provision of Well Intervention Vessel, Support Vessel
and Services for Abandonment and Decommissioning of
CHINGUETTI and BANDA Field, Mauritania |
2017 - 2018 |
SAMLING Resources Sdn. Bhd. / PC Mauritania 1 Pty. Ltd. |
Provision of well intervention vessel, support vessel
and services for abandonment and decommissioning of
CHINGUETTI and BANDA Field, Mauritania |
4 |
Provision of LCOT Effluent Discharge Pipeline
Replacement Project |
2016 - 2019 |
SABAH SHELL Petroleum Company/ SARAWAK SHELL Bhd./ SEA
HIBISCUS Sdn. Bhd. |
Existing pipelines & structure decommissioning/ removal
– near shore
Decommissioning/ removal of the existing dual pipelines
(carbon steel) from holding basin outfall to the existing
sump pit.
Decommissioning/ removal of the existing sump pit
(concrete structure)
Decommissioning/ removal of the existing outfall
pipeline (carbon steel) – near shore
|
5 |
Provision of Transportation and Installation of Topsides
for KEBABANGAN Northern Hub Development Project |
2011 - 2014 |
KEBABANGAN Petroleum Operating Company |
Offshore removal of sub-section of Drilling Support
Frame (DSF) and jacket Subsection Structure - Additional
work
Removal/ transportation engineering/ analysis
DSF subsection’s removal
Jacket subsection’s removal
Transportation of removal item
|
6 |
New Export Terminal Scraper Station (NETSS) Project |
Jan 2016 - Dec 2017 |
PETRONAS Gas Berhad |
Degassing, cleaning, gauging, dewatering, nitrogen
drying & commissioning
4" x 1.5 km bypass line
8" x 3.5 km butane pipeline
8" x 3.5km propane pipeline
12" x 4.3km gas pipeline
|
7 |
Provision Of Pre-Commissioning Services For Flexible
Flowline CENDOR Field Development Project Phase 2 Year 2015 |
Jul 2015 - Sep 2015 |
TL Offshore Sdn Bhd/ Petrofac (Malaysia-PM304) Limited |
Leak testing, De-oiling, Flooding & Dewatering
CDFL007 (12" x 3.475km Flexible Flowline)
CDFL002 (12" x 2.032km PRODUCTION-1)
CDPA-RF07-FL007 (12" X 0.25KM Prodcution-2)
CDFL003 (12" x 2.031km CDW-B Production-2)
CDFL007 (12" x CDW-C Production-2)
|
8 |
SILK 167 6” x 0.5km SJJT-A to SJP-A Wet Gas –
Multiphase Oil
SILK 158 6" x 0.5km SJJT-A/ SJP-A
SILK 158 6” x 0.5km SJJT-A/ SJP-A Wet Gas – Multiphase
Oil
SILK 158 6" x 0.5km SJJT-A/ SJP-A
|
Jun 2015 - Jul 2015 |
SABAH SHELL Petroleum Company |
Degassing/ de-oiling, gauging run, caliper run & MFL run
SILK 167 6” x 0.5km SJJT-A/ SJP-A wet gas – multiphase
oil
SILK 158 6" x 0.5KM SJJT-A/ SJP-A
SILK 158 6” x 0.5km SJJT-A/ SJP-A wet gas – multiphase
oil
SILK 158 6" x 0.5KM SJJT-A/ SJP-A
|
9 |
SILK 252 12” x 1.2km SJJT-G/ SJK-A Wet Gas
SILK 258 12” x 1.2km SJJT-B/ SJJT-G Wet Gas
SILK 150 12” x 3.4km SFJT-B/ SFP-A LP Oil
|
Jun 2015 - Jul 2015 |
SABAH SHELL Petroleum Company |
Degassing/ de-oiling, gauging run, caliper run & MFL run
SILK 252 12” x 1.2km SJJT-G/ SJK-A wet gas
SILK 258 12” x 1.2km SJJT-B/ SJJT-G wet gas
SILK 150 12” x 3.4km SFJT-B/ SFP-A LP oil
|
10 |
Pre-Commissioning Work for TAPIS Pipeline (EMEPMI TAPIS
PLATFORM) |
2015 |
ExxonMobil Exploration and Production Malaysia
Incorporated |
Pipeline de-oiling works |
11 |
ZUHAL East Development Project |
2015 |
PETRONAS Carigali Sdn. Bhd./ SBO |
Pipeline de-oiling and de-sanding works |
12 |
PL247 6” x 2.098km Multi phase line from TEJT-CC/ TEK-A
PL248 6” x 2.04km Gaslift from TEK-A/ TEKT-CC
|
2014 |
PETRONAS Carigali Sdn. Bhd./ SKO |
Pipeline decommissioning & pre-commissioning
Degassing/ pipeline de-oiling
Auxiliary pumping assist IP
Hydro-test
Dewatering and assist commissioning
|
13 |
PL355 18” x 18km BEP-A/ BNG-B |
2014 |
PETRONAS Carigali Sdn. Bhd./ SKO |
Pipeline decommissioning & pre-commissioning
Degassing with cleaning, gauging plate run
Caliper run, MFL run
De-watering
N2 purging & pack
|
14 |
FPSO WEST DESARU Flexible Flowline Project |
2014 |
Petrofac (Malaysia- PM304) Limited |
Leak testing, pipeline de-oiling & flooding |
15 |
PL261 6” x 5km from D18MP-A/ D18JT-B
PL264 6” x 3.67km from D18JT/ D18MP-A
|
2014 |
PETRONAS Carigali Sdn. Bhd./ SKO |
Pipeline de-oiling/degassing & gauging plate run,
caliper run, MFL run, dewatering, nitrogen purging &
packing |
16 |
Installation of Reinforced Thermoplastic (RTP)
Decommissioning of PL27, Pre-commissioning & Assist
Commissioning of PL27A
|
2013 |
PETRONAS Carigali Sdn. Bhd./ AEROSUN Corporation |
De-oiling, pigging (messenger line), cleaning run,
hydro-testing & assist commissioning
PL27 12” X 17km PULAI-A To TINGGI-A
PL27a 3” X 17km PULAI-A To TINGGI-A
|
17 |
PETRONAS Master Service Agreement (MSA) Pipeline
Pre-commissioning Projects (SKO/ SBO/ PMO) |
2007 - 2012 |
PETRONAS Carigali Sdn. Bhd. |
Pipeline de-oiling, degassing, assist IP pumping,
dewatering, assist commissioning |