Provision Of Deoiling and Intelligent Pigging for Sea
Hibiscus Pipeline
SILK 255 8” x km Gas Lift Pipeline SJJT-G to SJP-A
SILK 149 10” x km Crude Oil Pipeline SFJT-B to SFP- A
|
Apr 2018 - Jan 2019 |
Sea Hibiscus Sdn Bhd |
Assist intelligent pigging inspection, dewatering,
nitrogen drying |
2 |
Provision of LCOT Effluent Discharge Pipeline
Replacement Project |
2018 - 2019 |
"SABAH SHELL Petroleum Company/ SARAWAK SHELL Bhd./ SEA
HIBISCUS Sdn. Bhd." |
Pipeline leak test, endurance test (72hrs),
commissioning and system performance test |
3 |
Procurement, Construction & Commissioning of Underground
Pressurized - Non-Metallic Piping Fire water Network East
Side |
Aug 2016 - Nov 2019 |
"PRPC Utilities & Facilities Sdn. Bhd." |
Pipeline leak test/ hydrotest |
4 |
"Onshore Terengganu New Export Terminal Scraper Station
(NETSS) Project a) 4"" x 1.5 km Bypass Line b)
8"" x 3.5 km Butane Pipeline c) 8"" x 3.5km Propane
Pipeline d) 12"" x 4.3km Gas Pipeline"
|
Jan 2016 - Dec 2017 |
"PETRONAS Gas Berhad" |
Degasssing, cleaning, gauging, dewatering, nitrogen
drying & commissioning |
5 |
"6’’ X 3.654km SA-PA To SA- SA Water Injection Pipeline
8’’ X 3.729km SA-SA To SA- PA Multiphase Oil Pipeline" |
Aug 2016 - Oct 2016 |
"Murphy Oil Corp (MOC) TL Offshore Sdn Bhd" |
"Provision of pipeline pre - commissioning,
hydro-testing and spool leak test for MOC project year 2016
1. Cleaning gauging and filling 2. Hydro-testing 3. Spool
leak test 4. Assist commissioning" |
6 |
PCSB-SKO Auxiliary Pumping Services |
Aug 2016 - Sep 2016 |
PETRONAS Carigali Sdn Bhd-SKO |
SILK 165 & SILK 256 Aux Pumping |
7 |
Provision Of Pipeline Pre-Commissioning, Hydro-Testing
And Spool Leak Test For MOC Project Year 2016 6’’ x 3.654km
Sa-Pa To Sa-Sa Water Injection Pipeline 8’’ x 3.729km Sa-Sa
To Sa-Pa Multiphase Oil Pipeline |
Aug 2016 - Sep 2016 |
Murphy Oil Corp (MOC) TL Offshore Sdn Bhd |
Cleaning gauging and filling, hydro-testing, spool leak
test & assist commissioning |
8 |
Provision Of Pipeline Pre-Commissioning For Bardegg-2
And Baronia EOR Development Project P1: 24'' x 43km BNCPP-B
To TTJT-A P2: 24'' x 122km BNCPP-B To E11R-C |
Feb 2016 - Aug 2016 |
PETRONAS Carigali Sdn Bhd |
Flooding, cleaning, gauging, filling & hydrotest |
9 |
SABAH SARAWAK GAS PIPELINE (SSGP) PROJECT - ONSHORE
SABAH REGION |
Sep 2015 - Aug 2016 |
PETRONAS Gas Berhad |
Pipeline sectional cleaning, gauging, filling, assist
caliper, hydrotest, dewatering, vacuum drying & nitrogen
purge/pack and air blowing/water flushing |
10 |
Provision Of Pre-Commissioning Services Kanowit PFLNG
Tie -In Flexible Pipeline 10'' x 3.115km Flexible Pipeline |
Nov 2015 - Jul 2015 |
TECHNIP / PETRONAS Carigali Sdn Bhd |
Flooding, cleaning, gauging, filling & hydrotest |
11 |
Provision Of Pipeline Pre-Commissioning Services For
PCSB 20'' x 29.317km BSDP-A / ANDR-A |
Oct 2015 - July 2016 |
PETRONAS Carigali Sdn Bhd / TL Offshore |
Flooding, cleaning, gauging, filling & hydrotest |
12 |
Greater D18 Project (Flexible Pipeline) A-B (5.269KM)
A-C (3.996KM) |
Oct 2015 - Nov 2015 |
TECHNIP / PETRONAS Carigali Sdn Bhd |
Flooding, cleaning, gauging, filling & hydrotest |
13 |
24’’x4.917km Wet Gas pipeline from BOC to BOD |
Sep-15 |
TALISMAN (TML) / TL Offshore |
Cleaning, gauging & filling, hydrotest & water sampling,
hydrotest of spool, Subsea pig launcher & subsea pig
receiver |
14 |
Provision Of Pipeline Commissioning Services For HESS
Project 2015 1. 12'' x 5.120KM BRG-WHC to BRG-CPP
PIPELINE 2. 12'' x 8.670KM BRG-WHD to BRG-CPP PIPELINE
3. 16'' x 20.597KM KSM-WHA to BRG-CPP PIPELINE 4.
24'' x 18.195KM BRG-CPP to PLTS PIPELINE
|
Sep 2015 - Oct 2015 |
TL Offshore / HESS |
Flooding, cleaning, gauging, filling & hydrotest |
15 |
12'' X 62km SMA TO IBA Pipeline |
Sep 2015 - Oct 2015 |
LIN SCAN / EMEPMI |
Manpower supply of Lin Scan for pigging inspection |
16 |
PL086 16" X 8.54KM SBGAST TO POWERTRON |
Sept 2015 - Oct 2015 |
PETRONAS Carigali Sdn Bhd- SBO |
Intelligent pigging (Lin Scan) |
17 |
Provision Of Pre-Commissioning Services For Flexible
Flowline Cendor Field Development Project Phase 2 Year 2015
1. CDFL 007 (12"" x 3.475KM FLEXIBLE FLOWLINE) 2. CDFL 002
(12"" x 2.032KM PRODUCTION-1) 3. CDPA-RF07-FL007 (12"" X
0.25KM PRODCUTION-2) 4. CDFL003 (12"" x 2.031KM CDW-B
PRODUCTION-2) 5. CDFL 007 (12"" x CDW-C PRODUCTION-2) |
Jul 2015 - Sept 2015 |
TLO / PETROFAC |
Leak testing, flooding & dewatering |
18 |
SILK 167 6” x 0.5km SJJT-A to SJP-A Wet Gas – Multiphase
Oil SILK 158 6"" x 0.5KM SJJT-A TO SJP-A SILK 158 6” x
0.5km SJJT-A to SJP-A Wet Gas – Multiphase Oil SILK 158 6""
x 0.5KM SJJT-A TO SJP-A |
Jun 2015 - Jul 2015 |
Sabah Shell Petroleum Company Limited (SSPC) |
Gauging run, caliper run, MFL run |
19 |
Belum Development Project 16" X 8KM BE-SA/SN-PA |
Jul-15 |
MURPHY TL OFFSHORE |
Nitrogen batching / pigging, dewatering |
20 |
SILK 252 12” x 1.2km
SJJT-G to SJK-A Wet Gas SILK 258 12” x 1.2km
SJJT-G to SJK-A Wet Gas SILK 258 12” x 1.2km
SJJT-B to SJJT-G Wet Gas SILK 150 12” x 3.4km SFJT- B
to SFP-A LP Oil |
Jun 2015 - Jul 2015 |
Sabah Shell Petroleum Company Limited (SSPC) |
Gauging run, caliper run, MFL run |
21 |
10" x 4.0KM TaC TO TaA (GAS IN) PIPELINE |
Mar 2015 - Apr 2015 |
KHL / EMEPMI |
Bulk dewatering, final dewatering and nitrogen purging &
packing |
22 |
16'' x 44.24km SSGP Tee Off Sipitang to PML-2 Labuan
(DALAK PROJECT) |
Feb 2015 - Oct 2015 |
Petronas Carigali Sdn Bhd |
Water winning, cleaning, gauging, filling, assist
caliper, hydrotest, bulk dewatering, final dewatering,
vacuum drying & nitrogen purg/pack and air blowing/water
flushing, hydrotesting, dewatering, drying and nitrogen
packing for block valves and metering station |
23 |
DALAK PROJECT, 16'' x 44.24km SSGP Tee Off Sipitang to
PML-2 Labuan (Onshore Labuan & Onshore Sipitang Section) |
Feb 2015 - Oct 2015 |
PETRONAS Carigali Sdn Bhd |
Cleaning, gauging, filling, leak test/ hydrotest |
24 |
PENGERANG, JOHOR GAS PIPELINE: a) Provision Of
Pre-Comm, De-Comm and Commissiong for PGPP Pengerang
Pipeline a) 36"" x 73km from Permanent Launcher to
Permanent Receiver including 5 nos Block Valve Station; 5
nos of river crossing; and 1 no of metering station.
b) Pengerang Congen Plan Linepipe, 24"" x 1.8KM take off
ML505 to PCPLP
|
Apr 2014 - Jun 2016 |
PETRONAS Gas Berhad |
a) Cleaning, gauging, hydrotesting, bulk & final
dewatering, drying and nitrogen packing for pipeline and
air blowing/water flushing, hydrotesting, dewatering,
drying and nitrogen packing for block valves and metering
station. b) Cleaning, gauging, hydrotesting, bulk &
final dewatering, drying and nitrogen packing.
|
25 |
EPCC OF PRAI II LATERAL GAS PIPELINE PROJECT
Engineering, Procurement, Construction, |
Sep 2013 - Dec 2014 |
PETRONAS Gas Berhad |
Cleaning, gauging, hydrotesting, bulk & final
dewatering, drying and nitrogen packing for pipeline and
air blowing/water flushing, hydrotesting |
26 |
Provision of EVA-NMB Gas Delivery System (ENGDS) Shore
Approach for PCSB Project – Onshore Section |
2013 |
PETRONAS Carigali Sdn Bhd/ GLOBAL OFFSHORE Malaysia
Resources Sdn. Bhd. |
Cleaning, gauging, dewatering, nitrogen drying &
commissioning |
27 |
Procurement, Construction and Commissioning (PCC2) LGAST
to PML-2 Pipeline Project
12” dia. x 10.649km LGAST to PML-1 Pipeline
8” dia. x 708m PML-1/ PML-2 Pipeline
6” dia. x 708m Pipeline PML-1/ PML-2
|
Nov 2006 - Mar 2007 |
PETRONAS Carigali Sdn Bhd/ PETRONAS Methanol |
Cleaning, gauging, hydrotesting, bulk & final
dewatering, drying and nitrogen packing |
28 |
West Lobe Pipeline Development |
2006 |
Premier Oil Natuna BU Nipon Steel Corporation |
14 x 500m Subsea PLEM-WLWH Platform |
29 |
South Jambi 'B' Shallow Gas Project |
2004 |
Conoco Philips Indonesia Tripatra Engineers &
Contruction |
10" x 60km sales gas, 4" x 33km Condensate & 8" x 12km
flowline |